Project Name: Repair Dorms 539 & 542
Location: Misawa AB, Japan
Client: AFCEC
Contact Name: Joshua Biggers
Construction Cost: $34.5M
Completion Date: 2022 (Estimated Construction)
Role: OTIE (Prime) with RIM Architects and J Uno.
Description: Title I design for full renovations to two 129-room dormitories.   Scope included QoL upgrades, as well as converting the entire HVAC system from hot-water boiler to efficient variable refrigerant flow heat pump units with room controls and tied to the base’s EMCS.  Structural design included seismic, AT/FP, and snow loads, while dorm 542’s design included progressive collapse analysis.