Project Name: Repair/Consolidate Wastewater Treatment Plant
Location: Misawa AB, Japan
Client: AFCEC
Contact Name: Joshua Biggers
Construction Cost: $29.5M
Completion Date: 2020 (Construction); 2015 (Professional Services)
Role: OTIE (Prime) with Coffman Engineering and J Uno.
Description: Title I design modernizing the Main Base’s plant to increase treatment efficiency, reduce operational requirements, reduce energy consumption and chemical use, and improve safety.   Design also ‘right sized’ the capacity of the treatment plant and enabled the shut-down of the underutilized and costly North Base plant.  Developed the design so construction would occur in phases, allowing the primary WWTP to remain operational during construction.